Maanjiwe nendamowinan (formerly North Building phase B) opened in summer 2018. The building will be certified LEED Silver or better.

The building features: 

  • more than 80 per cent of the waste from the demolition of the old building was recycled or reused 
  • recycled and locally sourced building materials
  • a green cleaning program
  • low-emitting paints, sealants, coatings and flooring systems
  • the building is extremely water-efficient, using 88 per cent less potable water than a conventional building
  • a rainwater reuse system, with a capacity of 20,000 gallons — the collected rainwater is used for irrigation and toilet flushing
  • energy-efficient mechanical systems, which are expected to use 22 per cent less energy than a conventional building