Project Schedules and Updates

Update: Notification of Closure on Outer Circle, near Central Utilities Plant and drop off area for HMALC

Due to unexpected conditions, Outer Circle Road across from the Central Utilities Plant (CUP) continues to have a section closed to traffic, resulting in single-lane traffic. 

This closure is to allow for repairs to underground utilities tunnel for project UTM2020-21-14 CUP Tunnel Repairs.

 

The closure will result in one-way traffic will be controlled via traffic lights, but please expect delays.

Maintenance Period: 
Monday, June 21, 2021 to Friday, December 17, 2021

UPDATE: Notice of Service Interruption to Elevator #4, W.G. Davis Building and Elevator #2 as of Friday, November 12, 2021

Continuing through November 2021, elevator cab #4 continues to be offline to facilitate elevator modernization.  Elevator cab #2 in BC Block continues to be unavailable for service, followed at a later date by elevator cab #1.  

All elevator cabs will have an alternate elevator available while they are offline.

 

Maintenance Period: 
Friday, November 12, 2021

UPDATE: Notice of Electrical Interruption in W.G. Davis Building on Tuesday, November 30, 2021

The following is a notice regarding the upcoming power interruptions in W. G. Davis Building, on Tuesday, November 30th, 2021, from 6AM to 7AM for testing of the Emergency Power System. 

 

Maintenance Period: 
Tuesday, November 30, 2021

Campus Exterior Projects

Project Name Project Manager Status
RLE [Robotics Laboratory Environment] Phase 1 UTM M. Thomas Planning
RLE Consulting UTM M. Thomas Planning
5 Minute Walk Reconstruction UTM K. Ngo Planning

Campus Wide Projects

Project Name Project Manager Status
Integrated Waste Management Phase 1 UTM TBD Planning

Alumni House

Project Name Project Manager Status

Alumni House Fire Alarm Upgrade

UTM R. Seto Commissioning

Communication, Culture, and Technology Building (CCT)

Project Name Project Manager Status

CCT BFP Installation

UTM R. Seto

Design

CCT 2nd & 3nd Floor Reno Phase 2

3 Week Look Ahead Schedule

UTM  A. McCall

Construction

CCT Ving Card Replacement UTM R. Eidukaitis Design

CCT Humidifier Lifecycle Replacement

UTM R. Seto

Commissioning

CCT Lab 4012 and 4020 Reno

3 Week Look Ahead Schedule

UTM  A. McCall/ J. Lee

Construction

CCT Sump and Sewage Pump Replacement

        3 Week Look Ahead Schedule

UTM A. Rodrigues  Construction

Central Utilities Plant (CUP)

Project Name Project Manager Status

CUP Concrete Slab Replacement

UTM R. Seto Commissioning
CUP Expansion Feasibility Study (Phase 1) UTM J. Stille Design
CUP Office Renovation UTM M.Farrell Planning

CUP Tunnel Rehabilitation

3 Week Look Ahead Schedule

UTM R. Seto

Construction

 

CUP Water Softener and Dealkalizer

       3 Week Look Ahead Schedule

UTM A. Rodrigues  Construction

William G. Davis Building

Project Name Project Manager Status
DV A/B/C Blocks Research UPS UTM J. Lee Design

DV ERS/GGR/HCC Renovation, Phase I

UTM  M. Thomas / A.McCall

Commissioning

DV ERS/GGR/HCC Renovation, Phase 2

3 Week Look Ahead Schedule

UTM  M. Thomas A.McCall

Construction 

 

DV ERS/GGR/HCC Renovation, Phase 3 UTM M. Thomas Design
DV1007 & 1012 Growth Chamber Reno

UTM  TBD

Design

DV1029 Microscope Room Suite Upgrade

UTM  A.McCall

Commissioning

DV2072 Classroom Reno UTM  M. Thomas Planning

DV2028A Renovation

        3 Week Look Ahead Schedule

UTM  W. Tu

Construction

DV5023A CPS Grad Office UTM  TBD Design
DV2020/4023ABC BIO Grad Office UTM S. Bourguignon Design

DV A-Block Roof Replacement, 6th Floor

UTM W. Tu

Commissioning

DV4090C-E Renovation

UTM M. Thomas / A. McCall Commissioning

DV1083 Lab Renovation

3 Week Look Ahead Schedule

UTM A. McCall

Construction

 

DV1092A  HRS Office Renovation UTM  M. Thomas Design

DV Elevator Cabs #1, #2 & #4 Upgrades

3 Week Look Ahead Schedule

UTM Randy Seto

 

Construction

DV Laser Labs A/C Replacement (DV5033 DV5026 DV5020)

3 Week Look Ahead Schedule

UTM A. Rodrigues Construction

A Block Condensate Tank Replacement

3 Week Look Ahead Schedule

UTM A. Rodrigues

Construction

Deerfield Hall

Project Name

Project Manager Status

 

 

 

Erindale Studio Theatre

Project Name Project Manager Status

 

 

 

Research Greenhouse

Project Name Project Manager Status

 

 

 

Grounds Building

Project Name Project Manager Status
     

Terrence Donnelly Health Sciences Complex (HSC)

Project Name Project Manager Status

HSC 424 Anth Sleep Lab

UTM  M. Thomas Commissioning

Hazel McCallion Academic Learning Centre (HMALC)

Project Name Project Manager Status

HMALC 388 390 390V Reno (One Button Studio)

UTM  M. Thomas

Commissioning

ALC Humidifier Upgrade

UTM R. Seto

Commissioning

Instructional Centre

Project Name Project Manager Status
     

Innovation Complex

Project Name Project Manager Status

 

 

 

Kaneff Centre

Project Name Project Manager Status

KN206/215 Suite Renovation

UTM M. Thomas

Commissioning

New Science Building

Project Name Project Manager Status

New Science Building

3 Week Look Ahead Schedule

UTM A. Al Ashwal

 

Construction

 

Maanjiwe Nendamowinan

Project Name Project Manager Status

MN Building Deficiencies

TBD Commissioning
DH/MN Accessibility Door Upgrades TBD Planning

MN Mississaugas of the Credit First Nation Office

3 Week Look Ahead Schedule

UTM A. McCall

Construction

 

MN Privacy Film Installation TBD Planning

MN3110 Robotics Teaching Lab

UTM M. Thomas

Commissioning

Principal's Residence (Lislehurst)

Project Name Project Manager Status

 

 

 

Recreation, Athletics and Wellness Centre (RAWC)

                  Project Name                                          Project Manager       Status    

Davis & RAWC Building Exit Sign Upgrade

UTM A. Rodrigues  Commissioning

RAWC Roof Replacement and Restoration

        3 Week Look Ahead Schedule

UTM  W. Tu

Construction

Student Residences

Project Name Project Manager Status

 

 

 

 Student Centre

Project Name Project Manager Status